01924 471 955 enquiries@ybsltd.co.uk
YBS Building Services
  • Home
  • About us
  • Services
    • Mechanical
    • Electrical
    • Energy & Controls
    • Air conditioning
    • Manufacture
    • Maintenance
  • Health & Safety
  • News
  • Contact
  • Log In

Bespoke

Home Bespoke
Factory testing control and switch over panels

Factory testing control and switch over panels

  • July 21, 2024
  • Bespoke
Not everything we do can be completed on site and a lot of unseen work has to be done wayl before the construction begins. Last week we witnessed some live operational factory testing of 4no. new High Voltage (HV) 2…
Continue Reading→
  • tweet
  • like
  • plus one
  • pin it
Bespoke boiler installation

Bespoke boiler installation

  • September 25, 2015
  • AHU
Through our tag agreement with a nationwide network of specialist lifting contractors, YBS have recently undertaken the installation of a new LPHW air handling unit (AHU) within a new build warehouse. The AHU was a bespoke manufacture, designed to suit…
Continue Reading→
  • tweet
  • like
  • plus one
  • pin it
Recent Posts
  • Match Day Sponsor for the Dewsbury Rams
  • Factory testing control and switch over panels
  • Central London office fitout
  • New welfare and gym at Congleton Fire Station
  • Fantastic project at Manchester Uni
  • Fantastic project at Manchester Uni
News Archives
Yearly Archives
  • 2024 (11)
  • 2023 (38)
  • 2022 (23)
  • 2021 (8)
  • 2020 (14)
  • 2019 (24)
  • 2018 (27)
  • 2017 (31)
  • 2016 (36)
  • 2015 (47)
  • 2014 (10)
Copyright © 2022 Yorkshire Building Services Ltd. Access Works, Martin Street, Birstall, Batley WF17 9PJ.