When the final job on the list is to paint the floor, you know your Site Manager, for this pump replacement project, has gone above and beyond and we are delighted and proud of this attitude and attention to detail.

The chilled water pumps were replaced as part of an asset replacement programme and the pumps were replaced along with pipework alterations, power and BMS upgrades, chemical flush and glycol dose to the existing system.